Stockland Green College, Birmingham

Products:
Duo D410 Glass Infill Side Fix
Duo D411 Glass Infill Top Fix
Duo D431 Perforated Infill Top Fix

Contractor: Bovis Lend Lease
Architect: Associated Architects

Delta Balustrades were pleased to play a part in of the large Birmingham BSF Scheme with the completion of several hundreds of metres of balustrades in this new build project. Balustrades were installed to far reaching street areas with feature stairs leading to 2nd floor. Continuing across atrium bridge links on both 1st and 2nd floors, several staircases, and external terraces the Duo system provided a focal point for the building.

In line with Birmingham City Council’s requirements for schools, guarding to atrium edge and external terrace was required to be 1500mm high above FFL. A number of special access gates were required to match adjoining balustrades.

SPECIFICATIONS

Internal Balustrades
Product: Duo D411 Glass Infill Top Fix / Duo D410 Glass Infill Side Fix
Handrail: 50 Series Sigma stainless steel
Balustrade: HiBuild coated Duo balustrade
Infill: Clear glass infill panels with Barrel lug bolt through glass fixings

External Balustrades
Product: Duo D431 Perforated Infill Top Fix
Handrail: 50 Series Ultra™ stainless steel
Balustrade: HiBex coated Duo balustrade
Infill: HiBex coated perforated steel panels

 

Delta Balustrades
Stockland Green College, Birmingham
Stockland Green College, Birmingham
Stockland Green College, Birmingham
Stockland Green College, Birmingham
Stockland Green College, Birmingham