Crown House, London

 

Products:
Konnekt K100 vertical bar side fix system

RC Frame Contractor: Corbyn Construction

As part of the regeneration of Barking Town centre, the Crown House development creates 169 homes over 20 storeys, providing a vibrant and engaging place to live.

With 58 flights of stairs requiring 170 metres of balustrades, RC Frame Contractor Corbyn Construction sought an adaptive solution that would reduce time on site and improve efficiency and safety.

Opting for Delta’s Konnekt K100 offsite balustrade system allowed Corbyn Construction to install an instant safe stair to use, improving access and safety around the site, reducing installation times by 40% and eliminating the need for costly temporary edge protection.

Project Manager Jack Childs explained “The benefits of using a precast stair with a handrail already fitted is a very quick install. It’s dropped straight into place and is almost instantly available to use for access purposes which, from a health and safety point of view, is very good for us on site.”