The £4million campus modifications at Accrington & Rossendale College create a transformational green space to enhance the campus environment. Wildflower meadows are the backdrop to improved access, ensuring ease of movement around campus.

A modern and refined aesthetic has been created at the new main entrance with the installation of Orbis balustrades with toughened laminated glass infill. Whilst powder coated Orbis with vertical bars guides the way from the street level access elevator to the main entrance.

Incorporating Orbis with midrail infill to provide extra support for the high traffic main entrance steps, ensuring safety is paramount on campus.

SPECIFICATIONS

Main Entrance
Product: Orbis OS211 Glass Infill Top Fix
Handrail: 50 Series HiBex powder coated
Balustrade: 50 Series HiBex powder coated
Infill: Toughened Laminated Glass 11mm
Loading: 0.74kN/m

Product: Orbis OS221 Midrail Infill Top Fix
Handrail: 50 Series HiBex powder coated
Balustrade: 50 Series HiBex powder coated
Infill: 22mm HiBex midrails
Loading: 0.74kN/m

Product: Orbis OS201 Vertical Bar Infill Top Fix
Handrail: 50 Series HiBex powder coated
Balustrade: 50 Series HiBex powder coated
Infill: HiBex powder coated vertical bar panels
Loading: 0.74kN/m

Product: Orbis OS251 No Infill Top Fix
Handrail: 50 Series HiBex powder coated
Balustrade: 50 Series HiBex powder coated
Infill: No infill
Loading: 0.74kN/m