Product:
Orbis OS211 Glass Infill Top Fix
Contractor: Balfour Beatty Construction
Architect: Blue Sky Architects
The Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.
Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases.
At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost effective, high quality tubular balustrade solution for both staircases.
The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.
SPECIFICATIONS
Main Stair
Product: Orbis OS211 Glass Infill Top Fix
Handrail: 40 Series Sigma stainless steel
Balustrade: 50 Series Sigma stainless steel Orbis balustrade
Infill: Clear glass infill panels with Banjo lug bolt through glass fixings
Rear Stair
Product: Orbis OS211 Glass Infill Top Fix
Handrail: 40 Series Sigma stainless steel
Balustrade: 50 Series HiMet coated Orbis balustrade
Infill: Clear glass infill panels with D-lug bolt through glass fixings