Metrolink – Piccadilly & St Peters Square, Manchester

Product:
Orbis OS211 Glass Infill Top Fix

Contractor: Balfour Beatty Civil Engineering
Architect: Atkins

Delta Balustrades completed balustrades to 2 new metrolink stops as part of the upgrade to Manchester’s well recognised tramway network. To compliment the latest style, satin polished external grade balustrades and handrails were selected with additional handrails to meet necessary DDA requirements.

Close collaboration between Delta Balustrades, the Architect and the Main Contractor was essential to enable production and installation to commence swiftly due to tight timescales required.

Completion of the project on time required Delta Balustrades’ installation team to work out of normal working hours.

SPECIFICATIONS

Platform Balustrades
Product: Orbis OS211 Glass Infill Top Fix
Handrail: 50 Series Ultra stainless steel
Balustrade: 50 Series Ultra stainless steel
Infill: Clear glass infill panels with Banjo bolt through glass fixings
Loading: 0.74kN/m

Delta Balustrades
Metrolink – Piccadilly & St Peters Square, Manchester
Metrolink – Piccadilly & St Peters Square, Manchester
Metrolink – Piccadilly & St Peters Square, Manchester
Metrolink – Piccadilly & St Peters Square, Manchester