Delta Balustrades

Case Studies

Rugby School Modern Languages Centre, Rugby

Product:
Duo D410 Glass Infill Side Fix

Contractor: ISG Construction
Architect: HLN Architects

Delta Balustrades installed balustrades to 2 stairs and large curved walkways at the above project. The original specification for the project was Delta Balustrades and the client and the architect insisted on keeping this standard – even though another company had started the works.

Initially there was challenging timescales to meet as the project was very nearly complete. Digital surveying was done by Delta Balustrades to speed up the design process and ensure that accurate fixing positions were located.

Comment from the architect: “The original balustrades installed at the new modern languages building at Rugby School fell short of the exacting standards we required for this prestigious project. As such Delta were invited to help remedy the situation with a replacement system. The whole experience from the initial office visit, the supply of information, site survey and the final installation was very professional. The client and ourselves are very happy with the completed project and would not hesitate in recommending Delta Balustrades or using them again on future schemes.

SPECIFICATIONS

Main Stairs and Voids:
Product: Duo D410 Glass Infill Side Fix
Handrail: 50 Series Sigma stainless steel
Balustrade: HiBuild coated Duo balustrade.
Infill: Clear glass panels with Banjo lug bolt through glass fixings

Delta Balustrades
Rugby School Modern Languages Centre, Rugby
Rugby School Modern Languages Centre, Rugby
Rugby School Modern Languages Centre, Rugby
Rugby School Modern Languages Centre, Rugby