Delta Balustrades

News

Delta Balustrades Twitter

Latest Tweets from
Delta Balustrades

@deltabalustrade

CASE STUDY: Modern Languages Centre, Rugby #School Digital #surveying helped to speed up #balustrade #design at Rug… https://twitter.com/i/web/status/1230507514338455553

@deltabalustrade

Delta Balustrades named one of Paul Strudwick's, associate at @HKSArchitects , #specification favourites in @RIBAJhttps://twitter.com/i/web/status/1227970798943686656

New CPD – Integrating Offsite Balustrades

Posted on 11th May 2021

Stairs & Balustrades: How to Benefit from Offsite and Modular Systems Thursday 3rd June at 11am With Modern Methods of Construction making a mark in todays construction industry we take a look at how modular balustrade systems can integrate with precast concrete stairs to offer the perfect offsite solution.

Read more >

Handrail Transitions Made Simple

Posted on 8th April 2021

As balustrade specialists we know that maximising useable floor space in design may reduce the size of the stairwells, which can affect balustrade and handrail composition.

Read more >

NEW CPD AVAILABLE ON DEMAND

Posted on 10th March 2021

Our latest CPD, Balustrades and Stairs Joined Up Thinking, is now available to watch on demand.

Read more >

IT’S HERE – THE NEW KONNEKT® WEBSITE!

Posted on 4th March 2021

Click here to discover how Konnekt… saves 80% on installation time integrates with precast staircases is a fully modular product installed offsite You can also view technical details and watch Konnekt K100 in action at Crown House, London.

Read more >

Reducing Installation Times at Crown House, London

Posted on 18th February 2021

With 58 flights of stairs requiring 170 metres of balustrades, RC Frame Contractor Corbyn Construction sought an adaptive solution that would reduce time on site and improve efficiency and safety. Discover how Konnekt® K100 provided the time saving resolution required at Crown House, London. Read more…

Read more >